|
|
Funnels No 1 & 2 Port View |
|
Railings now installed. The railing aft of the expansion joint has been shortened slightly and a new upright glued onto the aft end. A small section of railing has also been built to fill in the gap between the small steps up to the 1st class lounge and the bulkhead. |
| This site was created by David Cotgreave January 2000 |